Traffic|

Hull Road & Queens Street Temporary Road Closure

  • Hull Road (from outside number 10 to the junction with Queen Street), Withernsea.
  • Queen Street (between numbers 121 and 137), Withernsea.

Commencing 27th July 2020 to enable gas mains replacement works to be carried out by Northern Gas Networks.

The road closure is necessary to enable the works to be carried out in a manner consistent with ensuring the safety of the public. The existing Order is valid for 18 months (with effect from 14 March 2020), but it is anticipated that the works will be completed by 28 August 2020.

The alternative route for traffic affected by the road closure will be via:
Hull Road, Arthur Street, Walter Street, Young Street, Bannister Street and Seaside Road, Withernsea.

The diversion route will be signed at the time of closure. The roads will be closed to all traffic but access will be maintained for residents, the emergency services and pedestrians.

Notice of Road Closure

Plan of Road Closure

Comments are closed.

Close Search Window